CBAM Default Emission Values

Official EU Commission reference emission factors for all six CBAM sectors. Used when verified actual data from the supplier is not available.

Calculate my CBAM cost →
Source: Commission Implementing Regulation (EU) 2023/1773, Annex III — Default values for embedded emissions. These factors apply from 1 January 2026 when actual verified data is unavailable. Using defaults may attract a 10% administrative surcharge in certain verification contexts.
🏗️

Cement

CN 2523, 6810–6812 · Direct emissions only
Product / Production RouteCN CodesDefault (tCO₂e / t)
Portland cement default 2523 21, 2523 29 0.763
Clinker 2523 10 0.831
Aluminous cement 2523 30 0.935
Other hydraulic cements / cement articles 2523 90, 6810–6812 0.763
⚙️

Iron & Steel

CN 7201–7326 · Direct + indirect emissions
Production RouteDescriptionDefault (tCO₂e / t)
BF-BOF default Blast Furnace – Basic Oxygen Furnace (integrated) 1.89
EAF scrap-based Electric Arc Furnace (secondary / mini-mill) 0.429
🔩

Aluminium

CN 7601–7616 · Direct + indirect (electricity) emissions
Production RouteDescriptionDefault (tCO₂e / t)
Primary aluminium (full) default Direct + indirect electricity emissions (global grid) 11.50
Primary aluminium (direct only) Direct anode / process emissions, excluding electricity 6.70
Secondary aluminium recycled Scrap-based, recycled input material 0.14
🌿

Fertilisers

CN 2808, 2814, 3102, 3105 · Direct process emissions incl. N₂O
ProductCN CodesDefault (tCO₂e / t)
Ammonia (NH₃) 2814 1.894
Nitric acid (HNO₃) 2808 0.302
Urea 3102 10 1.694
Mixed / compound fertilisers default 3102 30/60/80, 3105 2.400

Electricity

CN 2716 · Measured in MWh
ReferenceBasisDefault (tCO₂ / MWh)
EU grid average fallback Weighted average EU-27 generation mix 0.493
Country-specific defaults Per-country grid intensity (published by Commission) varies
PPA / metered pathway Specific generating unit, renewable PPA with hourly data near zero
💧

Hydrogen

CN 2804 10 · Direct + upstream methane leakage
Production PathwayMethodDefault (tCO₂e / t H₂)
Grey hydrogen default Steam Methane Reforming (SMR), no CCS 10.00
Blue hydrogen SMR + Carbon Capture & Storage (CCS, 85–95%) 3.00
Green hydrogen near zero Electrolysis using renewable electricity (RFNBO) 0.10

⚠️ Default Values and the 10% Penalty

When importers cannot provide verified actual emission data from their supplier, EU defaults are used to calculate the CBAM certificate obligation. In the context of the CBAM Level 2 Gap Analysis, the use of defaults — rather than verified actual values — triggers a 10% administrative surcharge on top of the default factor. Commissioning an EU-accredited third-party verifier to produce actual emission data eliminates this surcharge entirely and often results in a lower emission factor for modern or efficient producers.

How default values are used in CBAM calculations

The CBAM cost formula is the same whether you use defaults or verified actuals:

CBAM cost (€) = Quantity × Emission factor × EU ETS price − Carbon price deduction

The only variable is the emission factor: default values are supplied by the EU Commission, while actual values are certified by an accredited verifier. For a steel importer using the BF-BOF default of 1.89 tCO₂/t at an EU ETS price of €65/tCO₂, the CBAM cost per tonne is €122.85. An EAF producer with actual verified emissions of 0.4 tCO₂/t would pay only €26/t — a saving of nearly €97 per tonne.

Other sector pages

Calculate your exact CBAM cost

Enter your sector, quantity, and origin country — get an instant certificate cost estimate using these default values or your own verified data.

Open CBAM Calculator →